Description

Bunter Closure 39

Storage capex/ £millions

CO2 Injection Rate [106 Tonnes/yr] Injection Duration (yr)
10 20 30 40
2
5
10
15
20
40
60

Transmission capex/ £millions

CO2 Injection Rate [106 Tonnes/yr] Injection Duration (yr)
10 20 30 40
2
5
10
15
20
40
60

Storage opex/ £millions/year

CO2 Injection Rate [106 Tonnes/yr] Injection Duration (yr)
10 20 30 40
2
5
10
15
20
40
60

Transmission opex/ £millions/year

CO2 Injection Rate [106 Tonnes/yr] Injection Duration (yr)
10 20 30 40
2
5
10
15
20
40
60

Undiscounted lifetime cost of storage £/tCO2 stored

CO2 Injection Rate [106 Tonnes/yr] Injection Duration (yr)
10 20 30 40
2
5
10
15
20
40
60

Undiscounted lifetime cost of transmission and storage £/tCO2 transported and stored

CO2 Injection Rate [106 Tonnes/yr] Injection Duration (yr)
10 20 30 40
2
5
10
15
20
40
60

Summary

Capacity used in marginal cost curve/ Mt Undiscounted lifetime cost of storage in marginal cost curve at this capacity/ £/tCO2 Undiscounted lifetime cost of transmission and storage in marginal cost curve at this capacity/ £/t CO2 Assumed shoreline hub (for transmission cost)

For details of methodology, please refer to Chapter 7 in UKSAP final report and accompanying technical appendix.